



Godlan
Godlan Slitting Workbench
Do you need to track the break down of your raw material into slit jobs?
We assigned a planner code of MC (Master Coil) that is assigned to a raw material item to generate a slitting demand in the workbench.
After the planning run is generated, you will setup the # of arbor positions that generate the workbench configuration.
(This workbench can be setup with a maximum of 24 arbor positions.)
- Regular price
- $5,000.00
- Sale price
- $5,000.00
- Regular price
-
- Unit price
- / per


Heads up!
You May Also Like
These related items...