Godlan

Godlan Slitting Workbench

Do you need to track the break down of your raw material into slit jobs?

We assigned a planner code of MC (Master Coil) that is assigned to a raw material item to generate a slitting demand in the workbench.

After the planning run is generated, you will setup the # of arbor positions that generate the workbench configuration.

(This workbench can be setup with a maximum of 24 arbor positions.)

 

Regular price
$5,000.00
Sale price
$5,000.00
Regular price
Heads up!

You May Also Like

These related items...